Three sites. One operation.

We split the production layer (Paraguay) from the control and custody layer (Switzerland). It costs more to operate this way, but it means a regional outage never compromises both at once.

Paraguay-1 (Hernandarias)

Primary mining facility

Energy mix
100% hydroelectric (Itaipú grid)
Total capacity
82 MW
Racks deployed
1,240
PUE
1.07
Online since
Q3 2022

Paraguay-2 (Ciudad del Este)

Expansion + redundancy site

Energy mix
100% hydroelectric (Itaipú grid)
Total capacity
44 MW
Racks deployed
680
PUE
1.09
Online since
Q1 2024

Zurich (HQ + colo)

Custody, settlement, control plane

Energy mix
Mixed: hydro + nuclear (Swiss grid)
Total capacity
1.2 MW
Racks deployed
18
PUE
1.21
Online since
Q2 2021

Direct grid connection

Substation feeders straight from Itaipú - no retail markup, no last-mile losses.

Adiabatic cooling

Evaporative + free-air cooling cuts cooling overhead by ~70% vs. traditional CRAH.

Density-first design

23 kW per rack, with hot-aisle containment and dynamic airflow control.